Cacapon South Community has Emergency Exits (January 5, 2022) – The POA Board of Directors wants to remind property owners that aside from the main entrance to our community, there are two alternative emergency-only exits should rapid evacuation become necessary. Fires out West and at the State Park are a reminder to all that it is good to have a plan in the event of a fire emergency that might block our main entrance on Route 522. There is an
Keeping our Community Beautiful (November 17, 2021) – Volunteers continue to keep our community looking great. In late October the fence running along Rt522 was damaged by a driver running off the road into and through the fence. It was a hit and run so we have no idea of who may have caused it and specifically when the damage occurred. Our POA board assessed the damage and immediately ordered the needed materials to repair it. Once the materials arrived,
Flood Thread Reduction Effort Continues (March 13, 2019) — Flood threat reduction involves maintenance to clear tree stumps from the creek that winds its way through our community. Two enormous tree stumps that became a major obstacle in Indian Run as a result of the Summer 2018 flooding have been removed as part of the Board’s ongoing effort to remove snags and obstacles that could cause future flooding. The Cacapon South board thanks member Harry Weiss for his oversight and
POA Plans Roadway Tree Trimming, Improved Signs (May 17, 2018) —- The Cacapon South POA Maintenance Committee has marked small trees and branches that are intruding upon our roadways for removal. The limbs are a risk for tall vehicles like vans or delivery trucks because they can cause obstructed views at curves for drivers and pedestrians. Branches near roads to be trimmed The limbs will be cut back to the trunk of the tree, up to a height that will
2016 Road Paving Work Wraps Up (August 30, 2016) –The 2016 paving work was completed in late summer. Weaver Paving performed road repaving on three roads: MDG Court Marjorie Court Wards Court
Gatehouse Roof Replaced (October 10, 2015) — Thanks to Ari Gejevski for this snapshot of work to replace the roof at the community gatehouse on Route 522.